Optimize Inventory Planning and Accelerate Production Flow
DELMIA Ortems Synchronized Requirements Planning (SRP) optimizes inventory planning and production capacity by managing Just in Time (JIT) demands and Bill of Materials (BOM) levels with full integration. This solution provides a material flow and capacity synchronization system that supports material requirements planning (MRP) processes.
SRP accelerates supply chain planning processes by synchronizing purchase and work orders from raw materials to semi-finished and finished products. With its multi-level BOM approach, it makes it possible to accelerate flow lines, optimize inventory and incorporate existing raw material constraints into plans. Together with finite capacity planning and capacity requirements planning capabilities, it helps eliminate production bottlenecks.
Working in integration with the DELMIA Ortems Manufacturing Planner and Production Scheduling (Production Scheduler) solutions, it establishes the links between semi-finished and finished product work orders. This delivers production optimization, workload balancing and acceleration of the production flow. SRP enables businesses to operate in full alignment with their supply chain management system, production planning and control program, and digital transformation solutions.
Key Benefits
- Reduces buffer inventory.
- Synchronizes the multi-level bill of materials.
- Analyzes the impact across production.
- Provides dynamic traceability from customer to supplier.
- Improves customer service and lead time reliability.
- Synchronizes materials and jobs.